5kW Stand alone Power Systems – The Marra NSW

Client: Private Rural

Project: Installation of 5kw Stand Alone Power System

Project Brief: This property was an extremely remote sheep station. The client specified that reliability, durability and robustness were the main criteria for the project. They required minimum generator contribution. Vermin were a major concern. All modern appliance were required including climatic control using an evaporative air cooler 24/7 during the summer months as the outside temperatures often continued at 45 degrees and over for long periods.

System Details:

Selectronic SPMC481 Inverter/Chargers

20 Renesola Virtus II 260w Panels

3 Schneider XW-MPPT Regulators

48 LJW Solar 800Ah Batteries

LJW Solar Ground Mount

Commissioned: November 2016